The Methania liquefied natural gas carrier, with a capacity of 145,702 cubic metres, is due to arrive in the Zeebrugge LNG terminal on October 16, according to shipping data.
The liquefied natural gas carrier will probably load in a re-export cargo and depart from the Zeebrugge terminal on October 18.
The Zeebrugge LNG terminal is situated on a 30ha site in the outer port of Zeebrugge, Belgium.
It is operated by Fluxys LNG and has an annual throughput capacity of nine billion cubic meters (bcm) of natural gas.
LNG World News Staff, October 8, 2012; Image: Port of Zeebrugge
