MEO Australia announced the following update in relation to the Gurame SE-1X well being drilled offshore North Sumatra in the Seruway PSC using the Hercules #208 drilling rig.
Since the last report, the BOPs (Blow Out Preventers) were installed and tested, a LOT (Leak Off Test) was completed and the 12 ¼ “ hole has been drilled and steered to 2,041m MDRT.
MEO’s CEO and MD Jürgen Hendrich commented on the announcement: “Drilling is proceeding safely, without incident and according to plan. We look forward to the continuation of a safe and efficient drilling campaign to put the next section of the well behind casing before entering the first of the two reservoir objectives.”
LNG World News Staff, October 08, 2012
