Picture of the day: two LNG reloads at Gate

On 4 September, both the “Wilgas” and the “Coral Methane”, were moored and reloaded simultaneously at the jetties of the Dutch Gate LNG terminal.

This is the first time in its history Gate has simultaneously reloaded two LNG carriers.

Reloading of LNG at the terminal in the port of Rotterdam started in 2013. Since the modifications of the existing jetties to accommodate smaller ships, Gate has carried out 16 operations for these types of vessels.

The investment decision for the construction of a new break bulk terminal was taken on 1 July this year, which comprises a dedicated berth for small-scale LNG tankers and bares to enable future growth.

 

LNG World News Staff, September 18, 2014; Image: Gate

 

Share this article

Follow LNG World News

4 thoughts on “Picture of the day: two LNG reloads at Gate”

  1. Pingback: Julio
  2. Pingback: Bradley

Comments are closed.

Events>

<< Nov 2017 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

The 27th World Gas Conference (WGC 2018)

The 27th World Gas Conference (WGC 2018) will be the largest, most timely and most significant global gas conference and exhibition ever held.

read more >

CWC World LNG Summit & Awards Evening

The CWC World LNG Summit & Awards Evening is recognised as the premier end of year gathering for the global LNG industry.

read more >

CWC Japan LNG & Gas Summit

The inaugural CWC Japan LNG & Gas Summit, supported by METI, is the dedicated platform for international suppliers

read more >

Asia Pacific Maritime and Offshore Exhibition 2018

7 years in the making, APM is the premier shipbuilding & marine, workboat and offshore exhibition in Asia…

read more >