VIDEO: Hydrotesting of tanks complete at Swinoujscie LNG

Video: Hydrotesting complete at Swinoujscie LNG terminal

Polskie LNG, the Świnoujście LNG project investor, said it has completed the hydrotesting of the two LNG storage tanks at the terminal.

According to Maciej Mazur, Polskie LNG’s corporate communications director, testing on both storage tanks was completed successfully, with both structures holding the earlier designed parameters under a load of 100,000 metric tons.

Each tank was tested over a period of two weeks with water levels rising about two meters per day with the total height of water in the tanks reaching 22 meters or about 60% of the nominal capacity. This is due to the fact that water is heavier than LNG, stands in the Polskie LNG statement.

Upon completion of the tests, tanks were drained and cleaned thoroughly.

The following short video gives an insight into the testing process.

LNG World News Staff; Image: Polskie LNG

Share this article

Follow LNG World News

One thought on “VIDEO: Hydrotesting of tanks complete at Swinoujscie LNG”

Comments are closed.

Events>

<< Nov 2017 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

The 27th World Gas Conference (WGC 2018)

The 27th World Gas Conference (WGC 2018) will be the largest, most timely and most significant global gas conference and exhibition ever held.

read more >

CWC World LNG Summit & Awards Evening

The CWC World LNG Summit & Awards Evening is recognised as the premier end of year gathering for the global LNG industry.

read more >

CWC Japan LNG & Gas Summit

The inaugural CWC Japan LNG & Gas Summit, supported by METI, is the dedicated platform for international suppliers

read more >

Asia Pacific Maritime and Offshore Exhibition 2018

7 years in the making, APM is the premier shipbuilding & marine, workboat and offshore exhibition in Asia…

read more >