Bestobell’s fuel gas systems ordered for LNG-fueled tankers

Bestobell's fuel gas systems ordered for LNG-fueled tankers

Bestobell Marine, a supplier of cryogenic globe and check valves for ships has received its first order to supply fuel gas valves for new build tankers.

The vessels in question are two 15,000-dwt ice-class 1A asphalt and bitumen tankers , which have been ordered by Groupe Desgagnés of Canada and will be built at Besiktas shipyard in Turkey, the company said in a statement.

The ships will be equipped with dual-fuel engines allowing them to operate on LNG and fuel oil, and will have 600 cbm gas storage tanks on the decks.

The vessels will then serve the Great Lakes and Canada’s St. Lawrence River.

 

Image: Besiktas Shipyard

Share this article

Follow LNG World News

Events>

<< Apr 2020 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

Flame 2020

Flame is Europe’s largest and most influential meeting place for the global gas industry.

read more >

4th PNG Petroleum & Energy Summit

The CWC Group, in partnership with Kumul Petroleum Holdings Ltd.

read more >

FSRU World Congress 2020

FSRU World Congress 2020 will therefore focus on further Commercialising FSRUs through LNG-to-Power…

read more >

CWC World LNG & Gas Series: 12th Asia Pacific Summit

The 2020 Summit will offer an unrivaled programme covering relevant and significant discussion topics…

read more >