Gas Entec completes first U.S. LNG barge job

Gas Entec completes first U.S. LNG barge job

South Korean LNG engineering company Gas Entec delivered the liquefied natural gas handling equipment package for the 2,200-cbm bunkering barge being built by the Conrad Shipyard in Orange, Texas. 

Gas Entec added in its statement that the main cargo containment system is the GTT Mark III Flex system.

The company has provided the engineering detail design of the LNG cargo and bunkering handling system, along with supplying the related equipment and commissioning services.

In addition, the company delivered the electrical engineering for the first U.S. LNG bunkering barge, as well as the integration automation service, emergency shutdown system, cargo handling system, field measuring package, ship-to-ship communication link system and fire & gas detecting system.

The LNG barge is being built for WesPac Midstream and Clean Marine Energy service TOTE’s newbuild Marlin class container vessels and other LNG-fueled vessels in and around the Port of Jacksonville and the Southeast.

The barge designed by Bristol Harbor Group and classed by the American Bureau of Shipping (ABS) is scheduled for delivery during the first quarter of 2017.

 

LNG World News Staff

Share this article

Follow LNG World News

Events>

<< Jan 2019 >>
MTWTFSS
31 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3

Downstream 2019

Renowned as the most significant global meeting place for Downstream professionals…

read more >

Gas to Power APAC Congress 2019

The Gas to Power APAC Congress will bring together regional government officials and senior representatives from regulators…

read more >

2nd CWC Japan LNG & Gas Summit

The highly successful CWC Japan LNG & Gas Summit returns for a second year from 19-20 February 2019 in Tokyo, Japan…

read more >

Global LNG Forum 2019

Global LNG Forum is your opportunity to see what the future of LNG will be like…

read more >