Lena River heading to Gate LNG terminal for reload?

Lena River heading to Gate LNG terminal for reload?
Lena River LNG carrier (Image courtesy of Gazprom)

The 2013-built LNG carrier Lena River with a cargo capacity of 155,000 cubic meters is expected to dock at the Gate LNG terminal in the port of Rotterdam on Tuesday, August 16. 

According to the AIS data provided by the vessel tracking website, MarineTraffic, the vessel is currently sailing off Calais, France. With a current draught of 9.5 meters, the vessel is probably heading to the Gate LNG terminal to reload.

Lena River was built by the South Korean shipbuilder Hyundai Heavy Industries and is chartered on a 10-year deal to Gazprom’s unit, Gazprom Marketing & Trading.

 

LNG World News Staff

Share this article

Follow LNG World News

Events>

<< Oct 2019 >>
MTWTFSS
30 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3

CWC World LNG Summit & Awards Evening

The CWC World LNG Summit & Awards Evening will be returning to Rome in 2019 to celebrate it’s 20th year.

read more >

LNG Bunkering Mediterrean

The only 3-day course offering theoretical and practical training on LNG bunkering designed by the Mediterranean market leaders.   

read more >

6th Mozambique Gas Summit & Exhibit

This year’s edition will have a revamped programme for attendees.

read more >

FLNG World Congress 2019

2019 FLNG World Congress will bring together stakeholders across the floating liquefaction value…

read more >